As we always explain, lightning strikes hitting your power plant directly or falling within 2km of the facility cause serious damage to your facility.
The way to prevent this is to provide 4-way protection in the facility. Within the scope of the IEC 62305 standard, we must follow the steps of External Lightning Protection (Passive systems), AC-DC and Data Line Protection, and Equipotential Bonding System.
Take your precautions before lightning approaches your facility.
You can find the recording of a project in Maraş where lightning struck nearby in our video.