150 MW Solar Power Plant Protected by Yılkomer
11 March 2016Electrical Internal Installation Inspection
15 March 2016Grounding measurement should be carried out regularly not only for protection against lightning and overvoltage, but also to protect against factors that threaten life and property safety such as touch voltage and step voltage.
You May Be Interested In: Grounding Measurement Report
Inspection Periods of Grounding Installations
- Measurement and inspection of grounding resistances – 1 Year
- Inspection of grounding installations – 2 Years
- Fixed operating equipment – 1 Year
- Movable equipment – 6 Months
- Electric power generation, transmission and distribution facilities – 2 Years
- Energy transmission and distribution lines – 5 Years
You can fill out the form below immediately to have your grounding measurement performed.