Grounding Measurement Periods

Grounding measurement should be carried out regularly not only for protection against lightning and overvoltage, but also to protect against factors that threaten life and property safety such as touch voltage and step voltage.

You May Be Interested In: Grounding Measurement Report

toprakma-ölçüm-periyodları
We recommend that you perform grounding measurements regularly.

Inspection Periods of Grounding Installations

  • Measurement and inspection of grounding resistances – 1 Year
  • Inspection of grounding installations – 2 Years
  • Fixed operating equipment – 1 Year
  • Movable equipment – 6 Months
  • Electric power generation, transmission and distribution facilities – 2 Years
  • Energy transmission and distribution lines – 5 Years

You can fill out the form below immediately to have your grounding measurement performed.

Please enable JavaScript in your browser to complete this form.

What Do You Think?
Leave a Reply

Your email address will not be published. Required fields are marked *

Related Content