17 February 2026As YILKOMER, with our specialized risk analysis software and experienced field team, we carry out the required site inspection and risk analysis studies for lightning protection at your facilities using the most accurate methods.
As of September 1, 2025, in the updated periodic lightning protection system inspection forms,
risk analysis study and lightning protection project must be included.
Thanks to these two steps, we can make the most fundamental assessment of whether the facility is properly protected.
Within this scope, you can always receive support from the YILKOMER expert team regarding site inspections.
Our Main Objectives with YILKOMER Lightning Protection Site Inspection Studies
- To correctly carry out the risk analysis study, which is the most fundamental step of lightning protection, within the scope of IEC 62305 standards.
- To determine the most suitable lightning protection system for the facility on site.
- To perform calculations with accurate project drawings.
- To ensure coordination of air terminal design and risk analysis during the project design phase.
- To foresee possible challenges during the implementation phase and ensure the correct supply of equipment.
Within the Scope of IEC 62305 Standards
- Rolling Sphere Method
- Protection Angle Method
- Catenary Wire Method
- Mesh Method
- Insulated Air Terminal Systems
- LV Surge Arrester Systems
are mandatory for every facility as of September 1.
You can receive support from YILKOMER teams for the relevant site studies.