{"id":59423,"date":"2026-01-22T21:28:41","date_gmt":"2026-01-22T18:28:41","guid":{"rendered":"https:\/\/yilkomer.com\/yildirimdan-korunma-kesif-risk-analizi-ve-projelendirme-calismalari\/"},"modified":"2026-08-25T13:13:20","modified_gmt":"2026-08-25T10:13:20","slug":"lightning-protection-survey-risk-analysis-and-project-design-studies","status":"publish","type":"post","link":"https:\/\/yilkomer.com\/en\/lightning-protection-survey-risk-analysis-and-project-design-studies\/","title":{"rendered":"Lightning Protection Survey, Risk Analysis, and Project Design Studies"},"content":{"rendered":"<div class=\"vgblk-rw-wrapper limit-wrapper\">\n<div style=\"background: #F9F9F9; border-left: 4px solid #F3910D; padding: 16px 20px; margin: 16px 0; color: #585657; line-height: 1.7;\">In order to design lightning protection systems in the most accurate way, <strong>site inspection<\/strong> and subsequent <strong>risk analysis<\/strong> studies are mandatory steps.<br \/>\nAs YILKOMER, with our specialized risk analysis software and experienced field team, we carry out the required site inspection and risk analysis studies for lightning protection at your facilities using the most accurate methods.<\/div>\n<p style=\"color: #585657; line-height: 1.7; margin: 0 0 14px 0;\">As of <strong>September 1, 2025<\/strong>, in the updated periodic lightning protection system inspection forms,<br \/>\n<strong>risk analysis study<\/strong> and <strong>lightning protection project<\/strong> must be included.<br \/>\nThanks to these two steps, we can make the most fundamental assessment of whether the facility is properly protected.<br \/>\nWithin this scope, you can always receive support from the YILKOMER expert team regarding site inspections.<\/p>\n<h3 style=\"color: #1c2a39; margin: 22px 0 10px 0;\">Our Main Objectives with YILKOMER Lightning Protection Site Inspection Studies<\/h3>\n<ol style=\"color: #585657; line-height: 1.7; padding-left: 20px; margin: 0 0 16px 0;\">\n<li>To correctly carry out the risk analysis study, which is the most fundamental step of lightning protection, within the scope of IEC 62305 standards.<\/li>\n<li>To determine the most suitable lightning protection system for the facility on site.<\/li>\n<li>To perform calculations with accurate project drawings.<\/li>\n<li>To ensure coordination of air terminal design and risk analysis during the project design phase.<\/li>\n<li>To foresee possible challenges during the implementation phase and ensure the correct supply of equipment.<\/li>\n<\/ol>\n<h3 style=\"color: #1c2a39; margin: 22px 0 10px 0;\">Within the Scope of IEC 62305 Standards<\/h3>\n<ul style=\"color: #585657; line-height: 1.7; padding-left: 20px; margin: 0 0 16px 0;\">\n<li>Rolling Sphere Method<\/li>\n<li>Protection Angle Method<\/li>\n<li>Catenary Wire Method<\/li>\n<li>Mesh Method<\/li>\n<li>Insulated Air Terminal Systems<\/li>\n<li>LV Surge Arrester Systems<\/li>\n<\/ul>\n<div style=\"background: #F5F5F5; padding: 14px 18px; margin: 16px 0; border-radius: 6px; border: 1px dashed #C9CED6; color: #585657; line-height: 1.7;\">Do not forget that the most fundamental step of design and product selection starts with <strong>site analysis studies<\/strong>.<\/div>\n<div style=\"background: #1C2A39; color: #ffffff; padding: 18px 20px; border-radius: 8px; margin: 18px 0; line-height: 1.7;\"><strong>Important Note:<\/strong> Lightning protection and LV surge arrester system project design and risk analysis studies<br \/>\nare mandatory for every facility as of <strong>September 1<\/strong>.<br \/>\nYou can receive support from YILKOMER teams for the relevant site studies.<br \/>\nFor details, you can contact us at <strong>info@yilkomer.com<\/strong>.<\/div>\n<h5 style=\"color: #1c2a39; margin: 18px 0 0 0;\">\u26a1\ufe0f YILKOMER Protects Your Values!<\/h5>\n<\/div>\n<p><!-- .vgblk-rw-wrapper --><\/p>\n","protected":false},"excerpt":{"rendered":"<p>In order to design lightning protection systems in the most accurate way, site inspection and subsequent risk analysis studies are mandatory steps. As YILKOMER, with our specialized risk analysis software and experienced field team, we carry out the required site inspection and risk analysis studies for lightning protection at your facilities using the most accurate&#8230;<\/p>\n","protected":false},"author":1,"featured_media":992875,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[5],"tags":[],"class_list":["post-59423","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-general"],"_links":{"self":[{"href":"https:\/\/yilkomer.com\/en\/wp-json\/wp\/v2\/posts\/59423","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/yilkomer.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/yilkomer.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/yilkomer.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/yilkomer.com\/en\/wp-json\/wp\/v2\/comments?post=59423"}],"version-history":[{"count":1,"href":"https:\/\/yilkomer.com\/en\/wp-json\/wp\/v2\/posts\/59423\/revisions"}],"predecessor-version":[{"id":992876,"href":"https:\/\/yilkomer.com\/en\/wp-json\/wp\/v2\/posts\/59423\/revisions\/992876"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/yilkomer.com\/en\/wp-json\/wp\/v2\/media\/992875"}],"wp:attachment":[{"href":"https:\/\/yilkomer.com\/en\/wp-json\/wp\/v2\/media?parent=59423"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/yilkomer.com\/en\/wp-json\/wp\/v2\/categories?post=59423"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/yilkomer.com\/en\/wp-json\/wp\/v2\/tags?post=59423"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}