{"id":58946,"date":"2019-03-31T17:29:55","date_gmt":"2019-03-31T14:29:55","guid":{"rendered":"https:\/\/yilkomer.com\/elektrik-ic-tesisat-kontrolu-sartnamesi\/"},"modified":"2026-01-21T15:59:05","modified_gmt":"2026-01-21T12:59:05","slug":"electrical-internal-installation-inspection-specification","status":"publish","type":"post","link":"https:\/\/yilkomer.com\/en\/electrical-internal-installation-inspection-specification\/","title":{"rendered":"Electrical Internal Installation Inspection Specification"},"content":{"rendered":"<p style=\"font-weight: 400;\">As Y\u0131lkomer, we have summarized the issues we pay attention to during inspections below as items in the nature of a specification.<\/p>\n<p style=\"font-weight: 400;\"><strong>Electrical Internal Installation Inspection Specification items:<\/strong><\/p>\n<ol>\n<li>Machine, socket, and equipment groundings must be measured from the metal bodies of the machines using the loop impedance method and reported.<\/li>\n<li>Based on the impedance value measured with the loop impedance method, possible fault current values must be calculated, compared with the fault current values of the protective devices, checked for suitability, and reported.<\/li>\n<li>Continuity measurement between machine body groundings must be carried out, and it must be checked and reported that the grounding line reaches every metal part of the machine properly.<\/li>\n<li>All devices and equipment to be used in measurements must have calibration certificates issued by a laboratory with T\u00dcRKAK accreditation and must be submitted before starting the measurements.<\/li>\n<li>Tanks, lightning rods, transformer operating and protective groundings, and static plates must be measured using the 3-pole or 4-pole ground resistance measurement method and reported.<\/li>\n<li>While measuring the grounding of the lightning protection installation, the down conductors must be disconnected from the test clamp.<\/li>\n<li>Inspections of the lightning protection installation must be carried out in accordance with TSE EN 62305 and reported.<\/li>\n<li>The lightning rod coverage area project must be checked and reported whether it is sufficient.<\/li>\n<li>Other requirements of the lightning protection installation in accordance with TSE EN 62305 (surge arrester, equipotential system, etc.) must be inspected and reported.<\/li>\n<li>The tripping currents and tripping times of all residual current devices in the facility must be tested and reported.<\/li>\n<li>International standards and standards accepted in T\u00fcrkiye must be taken as reference in the evaluation of measurement results.<\/li>\n<li>Electrical panel groundings must be measured separately from the grounding bar and the panel door and reported.<\/li>\n<li>Visual inspections of electrical panels must be carried out with reference to standards accepted in T\u00fcrkiye and reported. (Panel grounding resistance, suitability of protective equipment, insulation mat in front of the panel with appropriate characteristics, all parts that require insulation such as bare conductors or busbars, panel door grounding, etc.)<\/li>\n<li>Thermal measurements of electrical distribution panels must be carried out and reported with real and thermal photographs.<\/li>\n<li>Energy quality measurement must be performed on the main distribution panels at the transformer output and automatically reported in accordance with EN 50160, the international Low Voltage Standard.<\/li>\n<\/ol>\n<p style=\"font-weight: 400;\">You can contact us to obtain detailed information about electrical internal installation inspections within the scope of the items we have specified.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>As Y\u0131lkomer, we have summarized the issues we pay attention to during inspections below as items in the nature of a specification. Electrical Internal Installation Inspection<span class=\"excerpt-hellip\"> [\u2026]<\/span><\/p>\n","protected":false},"author":1,"featured_media":58947,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_joinchat":[],"footnotes":""},"categories":[193],"tags":[],"class_list":["post-58946","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-general"],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v19.2.1 (Yoast SEO v27.4) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Electrical Internal Installation Inspection Specification | Y\u0131lkomer<\/title>\n<meta name=\"description\" content=\"Electrical Internal Installation Inspection Specification, as Y\u0131lkomer, we have summarized below in the form of a specification the points we pay attention to during inspections, listed as items.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/yilkomer.com\/en\/electrical-internal-installation-inspection-specification\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Electrical Internal Installation Inspection Specification\" \/>\n<meta property=\"og:description\" content=\"As Y\u0131lkomer, we have summarized the issues we pay attention to during inspections below as items in the nature of a specification. Electrical Internal\" \/>\n<meta property=\"og:url\" content=\"https:\/\/yilkomer.com\/en\/electrical-internal-installation-inspection-specification\/\" \/>\n<meta property=\"og:site_name\" content=\"Y\u0131lkomer\" \/>\n<meta property=\"article:author\" content=\"https:\/\/www.facebook.com\/yilkomer\" \/>\n<meta property=\"article:published_time\" content=\"2019-03-31T14:29:55+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-01-21T12:59:05+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/yilkomer.com\/wp-content\/uploads\/2019\/03\/Elektrik-\u0130\u00e7-Tesisat-Kontrol\u00fc-\u015eartnamesi-Resim.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"539\" \/>\n\t<meta property=\"og:image:height\" content=\"705\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Y\u0131ld\u0131r\u0131mdan Korunma Merkezi\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Y\u0131ld\u0131r\u0131mdan Korunma Merkezi\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/yilkomer.com\\\/en\\\/electrical-internal-installation-inspection-specification\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/yilkomer.com\\\/en\\\/electrical-internal-installation-inspection-specification\\\/\"},\"author\":{\"name\":\"Y\u0131ld\u0131r\u0131mdan Korunma Merkezi\",\"@id\":\"https:\\\/\\\/yilkomer.com\\\/en\\\/#\\\/schema\\\/person\\\/1378732ec91a59af36092fedd9f6f871\"},\"headline\":\"Electrical Internal Installation Inspection Specification\",\"datePublished\":\"2019-03-31T14:29:55+00:00\",\"dateModified\":\"2026-01-21T12:59:05+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/yilkomer.com\\\/en\\\/electrical-internal-installation-inspection-specification\\\/\"},\"wordCount\":417,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\\\/\\\/yilkomer.com\\\/en\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/yilkomer.com\\\/en\\\/electrical-internal-installation-inspection-specification\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/yilkomer.com\\\/wp-content\\\/uploads\\\/2019\\\/03\\\/Elektrik-\u0130\u00e7-Tesisat-Kontrol\u00fc-\u015eartnamesi-Resim.jpg\",\"articleSection\":[\"General\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/yilkomer.com\\\/en\\\/electrical-internal-installation-inspection-specification\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/yilkomer.com\\\/en\\\/electrical-internal-installation-inspection-specification\\\/\",\"url\":\"https:\\\/\\\/yilkomer.com\\\/en\\\/electrical-internal-installation-inspection-specification\\\/\",\"name\":\"Electrical Internal Installation Inspection Specification | Y\u0131lkomer\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/yilkomer.com\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/yilkomer.com\\\/en\\\/electrical-internal-installation-inspection-specification\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/yilkomer.com\\\/en\\\/electrical-internal-installation-inspection-specification\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/yilkomer.com\\\/wp-content\\\/uploads\\\/2019\\\/03\\\/Elektrik-\u0130\u00e7-Tesisat-Kontrol\u00fc-\u015eartnamesi-Resim.jpg\",\"datePublished\":\"2019-03-31T14:29:55+00:00\",\"dateModified\":\"2026-01-21T12:59:05+00:00\",\"description\":\"Electrical Internal Installation Inspection Specification, as Y\u0131lkomer, we have summarized below in the form of a specification the points we pay attention to during inspections, listed as items.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/yilkomer.com\\\/en\\\/electrical-internal-installation-inspection-specification\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/yilkomer.com\\\/en\\\/electrical-internal-installation-inspection-specification\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/yilkomer.com\\\/en\\\/electrical-internal-installation-inspection-specification\\\/#primaryimage\",\"url\":\"https:\\\/\\\/yilkomer.com\\\/wp-content\\\/uploads\\\/2019\\\/03\\\/Elektrik-\u0130\u00e7-Tesisat-Kontrol\u00fc-\u015eartnamesi-Resim.jpg\",\"contentUrl\":\"https:\\\/\\\/yilkomer.com\\\/wp-content\\\/uploads\\\/2019\\\/03\\\/Elektrik-\u0130\u00e7-Tesisat-Kontrol\u00fc-\u015eartnamesi-Resim.jpg\",\"width\":539,\"height\":705,\"caption\":\"Elektrik \u0130\u00e7 Tesisat Kontrol\u00fc \u015eartnamesi\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/yilkomer.com\\\/en\\\/electrical-internal-installation-inspection-specification\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Ana Sayfa\",\"item\":\"https:\\\/\\\/yilkomer.com\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Electrical Internal Installation Inspection Specification\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/yilkomer.com\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/yilkomer.com\\\/en\\\/\",\"name\":\"Y\u0131lkomer\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/yilkomer.com\\\/en\\\/#organization\"},\"alternateName\":\"Y\u0131lkomer\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/yilkomer.com\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/yilkomer.com\\\/en\\\/#organization\",\"name\":\"Yilkomer\",\"url\":\"https:\\\/\\\/yilkomer.com\\\/en\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/yilkomer.com\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/yilkomer.com\\\/wp-content\\\/uploads\\\/2015\\\/01\\\/logo.png\",\"contentUrl\":\"https:\\\/\\\/yilkomer.com\\\/wp-content\\\/uploads\\\/2015\\\/01\\\/logo.png\",\"width\":1000,\"height\":189,\"caption\":\"Yilkomer\"},\"image\":{\"@id\":\"https:\\\/\\\/yilkomer.com\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/yilkomer.com\\\/en\\\/#\\\/schema\\\/person\\\/1378732ec91a59af36092fedd9f6f871\",\"name\":\"Y\u0131ld\u0131r\u0131mdan Korunma Merkezi\",\"description\":\"Y\u0131lkomer (Y\u0131ld\u0131r\u0131mdan Korunma Merkezi) \u00fclkemizde y\u0131ld\u0131r\u0131mdan ve a\u015f\u0131r\u0131 gerilimden korunmada teknik eksiklikleri ortadan kald\u0131rarak tamamen standartlar ve m\u00fchendislik hesaplar\u0131na dayanarak sistem kurmay\u0131 hedeflemektedir.\",\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/yilkomer\",\"https:\\\/\\\/www.linkedin.com\\\/profile\\\/view?id=393173773&trk=nav_responsive_tab_profile\",\"https:\\\/\\\/x.com\\\/https:\\\/\\\/twitter.com\\\/yilkomer\",\"admin\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Electrical Internal Installation Inspection Specification | Y\u0131lkomer","description":"Electrical Internal Installation Inspection Specification, as Y\u0131lkomer, we have summarized below in the form of a specification the points we pay attention to during inspections, listed as items.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/yilkomer.com\/en\/electrical-internal-installation-inspection-specification\/","og_locale":"en_US","og_type":"article","og_title":"Electrical Internal Installation Inspection Specification","og_description":"As Y\u0131lkomer, we have summarized the issues we pay attention to during inspections below as items in the nature of a specification. Electrical Internal","og_url":"https:\/\/yilkomer.com\/en\/electrical-internal-installation-inspection-specification\/","og_site_name":"Y\u0131lkomer","article_author":"https:\/\/www.facebook.com\/yilkomer","article_published_time":"2019-03-31T14:29:55+00:00","article_modified_time":"2026-01-21T12:59:05+00:00","og_image":[{"width":539,"height":705,"url":"https:\/\/yilkomer.com\/wp-content\/uploads\/2019\/03\/Elektrik-\u0130\u00e7-Tesisat-Kontrol\u00fc-\u015eartnamesi-Resim.jpg","type":"image\/jpeg"}],"author":"Y\u0131ld\u0131r\u0131mdan Korunma Merkezi","twitter_misc":{"Written by":"Y\u0131ld\u0131r\u0131mdan Korunma Merkezi","Est. reading time":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/yilkomer.com\/en\/electrical-internal-installation-inspection-specification\/#article","isPartOf":{"@id":"https:\/\/yilkomer.com\/en\/electrical-internal-installation-inspection-specification\/"},"author":{"name":"Y\u0131ld\u0131r\u0131mdan Korunma Merkezi","@id":"https:\/\/yilkomer.com\/en\/#\/schema\/person\/1378732ec91a59af36092fedd9f6f871"},"headline":"Electrical Internal Installation Inspection Specification","datePublished":"2019-03-31T14:29:55+00:00","dateModified":"2026-01-21T12:59:05+00:00","mainEntityOfPage":{"@id":"https:\/\/yilkomer.com\/en\/electrical-internal-installation-inspection-specification\/"},"wordCount":417,"commentCount":0,"publisher":{"@id":"https:\/\/yilkomer.com\/en\/#organization"},"image":{"@id":"https:\/\/yilkomer.com\/en\/electrical-internal-installation-inspection-specification\/#primaryimage"},"thumbnailUrl":"https:\/\/yilkomer.com\/wp-content\/uploads\/2019\/03\/Elektrik-\u0130\u00e7-Tesisat-Kontrol\u00fc-\u015eartnamesi-Resim.jpg","articleSection":["General"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/yilkomer.com\/en\/electrical-internal-installation-inspection-specification\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/yilkomer.com\/en\/electrical-internal-installation-inspection-specification\/","url":"https:\/\/yilkomer.com\/en\/electrical-internal-installation-inspection-specification\/","name":"Electrical Internal Installation Inspection Specification | Y\u0131lkomer","isPartOf":{"@id":"https:\/\/yilkomer.com\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/yilkomer.com\/en\/electrical-internal-installation-inspection-specification\/#primaryimage"},"image":{"@id":"https:\/\/yilkomer.com\/en\/electrical-internal-installation-inspection-specification\/#primaryimage"},"thumbnailUrl":"https:\/\/yilkomer.com\/wp-content\/uploads\/2019\/03\/Elektrik-\u0130\u00e7-Tesisat-Kontrol\u00fc-\u015eartnamesi-Resim.jpg","datePublished":"2019-03-31T14:29:55+00:00","dateModified":"2026-01-21T12:59:05+00:00","description":"Electrical Internal Installation Inspection Specification, as Y\u0131lkomer, we have summarized below in the form of a specification the points we pay attention to during inspections, listed as items.","breadcrumb":{"@id":"https:\/\/yilkomer.com\/en\/electrical-internal-installation-inspection-specification\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/yilkomer.com\/en\/electrical-internal-installation-inspection-specification\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/yilkomer.com\/en\/electrical-internal-installation-inspection-specification\/#primaryimage","url":"https:\/\/yilkomer.com\/wp-content\/uploads\/2019\/03\/Elektrik-\u0130\u00e7-Tesisat-Kontrol\u00fc-\u015eartnamesi-Resim.jpg","contentUrl":"https:\/\/yilkomer.com\/wp-content\/uploads\/2019\/03\/Elektrik-\u0130\u00e7-Tesisat-Kontrol\u00fc-\u015eartnamesi-Resim.jpg","width":539,"height":705,"caption":"Elektrik \u0130\u00e7 Tesisat Kontrol\u00fc \u015eartnamesi"},{"@type":"BreadcrumbList","@id":"https:\/\/yilkomer.com\/en\/electrical-internal-installation-inspection-specification\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Ana Sayfa","item":"https:\/\/yilkomer.com\/en\/"},{"@type":"ListItem","position":2,"name":"Electrical Internal Installation Inspection Specification"}]},{"@type":"WebSite","@id":"https:\/\/yilkomer.com\/en\/#website","url":"https:\/\/yilkomer.com\/en\/","name":"Y\u0131lkomer","description":"","publisher":{"@id":"https:\/\/yilkomer.com\/en\/#organization"},"alternateName":"Y\u0131lkomer","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/yilkomer.com\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/yilkomer.com\/en\/#organization","name":"Yilkomer","url":"https:\/\/yilkomer.com\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/yilkomer.com\/en\/#\/schema\/logo\/image\/","url":"https:\/\/yilkomer.com\/wp-content\/uploads\/2015\/01\/logo.png","contentUrl":"https:\/\/yilkomer.com\/wp-content\/uploads\/2015\/01\/logo.png","width":1000,"height":189,"caption":"Yilkomer"},"image":{"@id":"https:\/\/yilkomer.com\/en\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/yilkomer.com\/en\/#\/schema\/person\/1378732ec91a59af36092fedd9f6f871","name":"Y\u0131ld\u0131r\u0131mdan Korunma Merkezi","description":"Y\u0131lkomer (Y\u0131ld\u0131r\u0131mdan Korunma Merkezi) \u00fclkemizde y\u0131ld\u0131r\u0131mdan ve a\u015f\u0131r\u0131 gerilimden korunmada teknik eksiklikleri ortadan kald\u0131rarak tamamen standartlar ve m\u00fchendislik hesaplar\u0131na dayanarak sistem kurmay\u0131 hedeflemektedir.","sameAs":["https:\/\/www.facebook.com\/yilkomer","https:\/\/www.linkedin.com\/profile\/view?id=393173773&trk=nav_responsive_tab_profile","https:\/\/x.com\/https:\/\/twitter.com\/yilkomer","admin"]}]}},"_links":{"self":[{"href":"https:\/\/yilkomer.com\/en\/wp-json\/wp\/v2\/posts\/58946","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/yilkomer.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/yilkomer.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/yilkomer.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/yilkomer.com\/en\/wp-json\/wp\/v2\/comments?post=58946"}],"version-history":[{"count":2,"href":"https:\/\/yilkomer.com\/en\/wp-json\/wp\/v2\/posts\/58946\/revisions"}],"predecessor-version":[{"id":58954,"href":"https:\/\/yilkomer.com\/en\/wp-json\/wp\/v2\/posts\/58946\/revisions\/58954"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/yilkomer.com\/en\/wp-json\/wp\/v2\/media\/58947"}],"wp:attachment":[{"href":"https:\/\/yilkomer.com\/en\/wp-json\/wp\/v2\/media?parent=58946"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/yilkomer.com\/en\/wp-json\/wp\/v2\/categories?post=58946"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/yilkomer.com\/en\/wp-json\/wp\/v2\/tags?post=58946"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}