{"id":53678,"date":"2016-03-22T20:41:44","date_gmt":"2016-03-22T18:41:44","guid":{"rendered":"https:\/\/yilkomer.com\/gunes-enerji-santralleri-kabullerinde-dikkat-edilecek-hususlar\/"},"modified":"2025-12-20T00:15:53","modified_gmt":"2025-12-19T21:15:53","slug":"key-points-to-consider-during-the-acceptance-of-solar-power-plants","status":"publish","type":"post","link":"https:\/\/yilkomer.com\/en\/key-points-to-consider-during-the-acceptance-of-solar-power-plants\/","title":{"rendered":"Key Points to Consider During the Acceptance of Solar Power Plants"},"content":{"rendered":"<p><strong>1- GENERAL:<\/strong><\/p>\n<ol>\n<li>Was the facility installed in accordance with its project?<\/li>\n<li>Was the underground cable installation carried out in accordance with the Cable Installation Procedures and Principles?<\/li>\n<li>Are there route marker plates (gabara) on the cable route? (To be used at a maximum of every 50 m, at all turns and road crossings)<\/li>\n<li>At building entrances, are the cables installed inside pipes? Is the space between the pipe and the cable filled with suitable material?<\/li>\n<li>Is there interior lighting in electrical installations?<\/li>\n<li>Are insect screens installed in ventilation openings?<\/li>\n<li>Is there a Danger of Death Warning Sign on all movable doors?<\/li>\n<li>Is there a Transformer Name plate on the door of each transformer center (transformer + cell + panel)?<\/li>\n<li>Are all doors opening outward and made of steel sheet?<\/li>\n<li>Are there automatic battery-powered Emergency Lamps in every section of transformer centers?<\/li>\n<li>Is there a Fire Extinguisher (CO2) within 25 m of each transformer center?<\/li>\n<li>Is there a First Aid Kit within 25 m of each transformer center?<\/li>\n<li>Is the operating grounding below 1 ohm and the protective grounding below 1 ohm?<\/li>\n<li>At the PV plant entrance, fences, structures, concrete kiosks, inverters, cable trays, etc., are the warning signs specified in the annex used?<\/li>\n<li>Cables must be labeled.<\/li>\n<\/ol>\n<p><a href=\"https:\/\/yilkomer.com\/wp-content\/uploads\/2015\/09\/r\u00fczgar-g\u00fcne\u015f-koruma.jpg\" rel=\"attachment wp-att-4285\"><img loading=\"lazy\" decoding=\"async\" class=\"size-full wp-image-4285 aligncenter\" src=\"https:\/\/yilkomer.com\/wp-content\/uploads\/2015\/09\/r\u00fczgar-g\u00fcne\u015f-koruma.jpg\" alt=\"wind-solar-protection\" width=\"600\" height=\"400\" srcset=\"https:\/\/yilkomer.com\/wp-content\/uploads\/2015\/09\/r\u00fczgar-g\u00fcne\u015f-koruma.jpg 600w, https:\/\/yilkomer.com\/wp-content\/uploads\/2015\/09\/r\u00fczgar-g\u00fcne\u015f-koruma-300x200.jpg 300w, https:\/\/yilkomer.com\/wp-content\/uploads\/2015\/09\/r\u00fczgar-g\u00fcne\u015f-koruma-219x146.jpg 219w, https:\/\/yilkomer.com\/wp-content\/uploads\/2015\/09\/r\u00fczgar-g\u00fcne\u015f-koruma-50x33.jpg 50w, https:\/\/yilkomer.com\/wp-content\/uploads\/2015\/09\/r\u00fczgar-g\u00fcne\u015f-koruma-113x75.jpg 113w\" sizes=\"auto, (max-width:767px) 480px, 600px\" \/><\/a><\/p>\n<p><strong>2- TRANSFORMER COMPARTMENT:<\/strong><\/p>\n<ol>\n<li>Are the transformer nameplate values compatible with the project?<\/li>\n<li>Is there body grounding of the transformer at two points, on the cover and at the base?<\/li>\n<li>Is there a chain and Danger of Death Warning Sign at the entrance of the transformer compartment?<\/li>\n<li>Is there insulation on LV and MV bushings to protect against contact?<\/li>\n<li>Are the transformer wheels fixed with wedges?<\/li>\n<li>Is all metal equipment in the transformer compartment grounded?<\/li>\n<li>Is there at least 60 cm distance between the transformer and the walls? (Not applicable for concrete kiosks)<\/li>\n<li>Are MV cable cross-sections compatible with the project?<\/li>\n<\/ol>\n<p><strong>3- MV CONTROL COMPARTMENT<\/strong><\/p>\n<ol>\n<li>Is the installation of the cells carried out in accordance with the project?<\/li>\n<li>Do MV cells have body grounding?<\/li>\n<li>Is all metal equipment in the MV control compartment grounded?<\/li>\n<li>Is the distance between the cells and the rear wall equal to or greater than 10 cm?<\/li>\n<li>Are MV gloves, insulating mats, and stools available?<\/li>\n<li>Is there a BAR-24 separately for each MV Control compartment?<\/li>\n<li>Is there a Fire Extinguisher (CO2) within a maximum of 25 m of each MV Control Compartment?<\/li>\n<li>Is the top of the cable duct in the cell compartment covered with galvanized sheet metal?<\/li>\n<li>Is there a single-line diagram in the MV Control Compartment?<\/li>\n<li>Are there plates on MV cells indicating input\/output information?<\/li>\n<li>Is there a First Aid Instruction for electrical accidents?<\/li>\n<li>When the power goes out, the autoproducer breaker must open.<\/li>\n<li>When the power is restored, the autoproducer breaker must close.<\/li>\n<li>When the autoproducer breaker is opened manually, it must not reclose automatically.<\/li>\n<\/ol>\n<p><a href=\"https:\/\/yilkomer.com\/wp-content\/uploads\/2015\/08\/solar-tarlas\u0131-kayseri.jpg\" rel=\"attachment wp-att-4139\"><img loading=\"lazy\" decoding=\"async\" class=\"size-full wp-image-4139 aligncenter\" src=\"https:\/\/yilkomer.com\/wp-content\/uploads\/2015\/08\/solar-tarlas\u0131-kayseri.jpg\" alt=\"solar-field-kayseri\" width=\"467\" height=\"350\" srcset=\"https:\/\/yilkomer.com\/wp-content\/uploads\/2015\/08\/solar-tarlas\u0131-kayseri.jpg 467w, https:\/\/yilkomer.com\/wp-content\/uploads\/2015\/08\/solar-tarlas\u0131-kayseri-300x225.jpg 300w, https:\/\/yilkomer.com\/wp-content\/uploads\/2015\/08\/solar-tarlas\u0131-kayseri-195x146.jpg 195w, https:\/\/yilkomer.com\/wp-content\/uploads\/2015\/08\/solar-tarlas\u0131-kayseri-50x37.jpg 50w, https:\/\/yilkomer.com\/wp-content\/uploads\/2015\/08\/solar-tarlas\u0131-kayseri-100x75.jpg 100w\" sizes=\"auto, (max-width:767px) 467px, 467px\" \/><\/a><\/p>\n<p><strong>4- LV PANEL and FIELD COMBINER PANEL<\/strong><\/p>\n<ol>\n<li>Are the nameplate values of the LV Panel compatible with the project?<\/li>\n<li>Does the LV Panel have body grounding?<\/li>\n<li>Is all metal equipment in the LV panel compartment grounded?<\/li>\n<li>Are the ratings of the MCCB and outgoing fuses in the <strong>LV Panel<\/strong> compatible with the project?<\/li>\n<li>In the LV panel, when power is cut from MV, the motorized MCCB must open (if specified in the project).<\/li>\n<li>In the LV panel, when power is supplied from MV, the motorized MCCB must close (if specified in the project).<\/li>\n<li>When opened manually in the LV panel, the motorized MCCB must not reclose (if specified in the project).<\/li>\n<li>When the motorized MCCB is opened manually, there must be no energy on the lower busbars of the MCCB.<\/li>\n<li>Are measuring devices connected before the MCCB? (Do they measure energy when the MCCB is open (0)?)<\/li>\n<li>Are MV cable cross-sections compatible with the project?<\/li>\n<li>In the field panel, are DC fuses correct and are RCD values correct? Are short-circuit breaking capacities correct?<\/li>\n<li>LV panels must have an Emergency Trip Button that directly trips the transformer protection cell.<\/li>\n<\/ol>\n<div id=\"attachment_3812\" style=\"width: 684px\" class=\"wp-caption aligncenter\"><a href=\"https:\/\/yilkomer.com\/wp-content\/uploads\/2015\/03\/enpov-g\u00fcne\u015f.jpg\" rel=\"attachment wp-att-3812\"><img loading=\"lazy\" decoding=\"async\" aria-describedby=\"caption-attachment-3812\" class=\" wp-image-3812\" src=\"https:\/\/yilkomer.com\/wp-content\/uploads\/2015\/03\/enpov-g\u00fcne\u015f.jpg\" alt=\"Enpoc solar power plant lightning and surge protection\" width=\"674\" height=\"379\" srcset=\"https:\/\/yilkomer.com\/wp-content\/uploads\/2015\/03\/enpov-g\u00fcne\u015f.jpg 1280w, https:\/\/yilkomer.com\/wp-content\/uploads\/2015\/03\/enpov-g\u00fcne\u015f-300x169.jpg 300w, https:\/\/yilkomer.com\/wp-content\/uploads\/2015\/03\/enpov-g\u00fcne\u015f-1024x576.jpg 1024w, https:\/\/yilkomer.com\/wp-content\/uploads\/2015\/03\/enpov-g\u00fcne\u015f-706x397.jpg 706w, https:\/\/yilkomer.com\/wp-content\/uploads\/2015\/03\/enpov-g\u00fcne\u015f-978x550.jpg 978w, https:\/\/yilkomer.com\/wp-content\/uploads\/2015\/03\/enpov-g\u00fcne\u015f-788x443.jpg 788w, https:\/\/yilkomer.com\/wp-content\/uploads\/2015\/03\/enpov-g\u00fcne\u015f-1060x596.jpg 1060w, https:\/\/yilkomer.com\/wp-content\/uploads\/2015\/03\/enpov-g\u00fcne\u015f-697x392.jpg 697w, https:\/\/yilkomer.com\/wp-content\/uploads\/2015\/03\/enpov-g\u00fcne\u015f-515x290.jpg 515w\" sizes=\"auto, (max-width:767px) 480px, 674px\" \/><\/a><p id=\"caption-attachment-3812\" class=\"wp-caption-text\">Enpoc solar power plant lightning and surge protection<\/p><\/div>\n<p><strong>5- INVERTER<\/strong><\/p>\n<ol>\n<li>The manufacturing date of panels and inverters must not exceed 5 years. Serial numbers of inverters and panels are important.<\/li>\n<li>Inverter power ratings and configurations must comply with the project.<\/li>\n<li>When grid power is cut, a test must be performed to verify that the inverters stop operating.<\/li>\n<li>The presence of DC fuses and surge arresters inside the inverter must be checked according to the project.<\/li>\n<\/ol>\n<p><strong>6- SOLAR PANELS<\/strong><\/p>\n<ol>\n<li>The manufacturing date of panels and inverters must not exceed 5 years. Serial numbers of inverters and panels are important.<\/li>\n<li>Does it comply with the site layout plan? Are panel placements and quantities correct? Are panel power ratings correct?<\/li>\n<li>Special attention must be paid to the front-rear height, tilt angles, and spacing between panels to ensure compliance with the project.<\/li>\n<\/ol>\n<p><strong>7- FIELD APPLICATIONS: CONSTRUCTION\u2013STRUCTURE\u2013FENCE\u2013CABLE TRAY<\/strong><\/p>\n<ol>\n<li>Installation must be carried out in accordance with the approved construction project.<\/li>\n<li>Special attention must be paid to the front-rear height, tilt angles, and spacing between panels to ensure compliance with the project.<\/li>\n<li>Warning signs specified in the annex must be used frequently on fences, cable trays, and piles.<\/li>\n<li>There must be barbed wire under the fence.<\/li>\n<li>Fire extinguishers must be available at various points in the field (especially near field panels).<\/li>\n<li>Concrete kiosks and field combiner panel access roads must be suitable for vehicle access (gravel\/paving\/asphalt\/stabilized, etc.).<\/li>\n<li>There must be no grass, trees, or bushes in the field.<\/li>\n<\/ol>\n<p><strong>8- GROUNDING\u2013LIGHTNING PROTECTION \u2013<span style=\"color: #ff6600;\"><a href=\"https:\/\/yilkomer.com\/ag-parafudr-fiyat-listesi\/\" target=\"_blank\" rel=\"noopener noreferrer\">LV SURGE ARRESTER<\/a><\/span><\/strong><\/p>\n<ol>\n<li>Grounding must be carried out in accordance with the approved grounding project.<\/li>\n<li>When using Cu and Al during grounding, bimetal must be used at connection points and precautions must be taken against oxidation.<\/li>\n<li>Even if not included in the project, all metal equipment in the facility (doors, fences, etc.) must be grounded.<\/li>\n<li>Both operating and protective grounding must be below 1 ohm.<\/li>\n<li>A report proving that grounding measurements were carried out by an authorized engineer, authorization documents, calibration certificates, must be submitted as an annex to the provisional acceptance report.<\/li>\n<li>Were <strong>Class B+C Surge Arresters<\/strong> used on AC and DC lines and <strong>Class D Surge Arresters<\/strong> on communication lines?<\/li>\n<li>Was the External Lightning Protection System bonded to equipotential? Were spark gap arresters used?<\/li>\n<li>Was the External Lightning Protection System designed in accordance with IEC 62305? Are the air terminals used anticorrosive?<\/li>\n<li>Were measurements of the External Lightning Protection System carried out in accordance with IEC standards?<\/li>\n<li>Was equipotential bonding achieved in the facility? Does the resistance difference across the facility exceed 0.2 ohms?<\/li>\n<\/ol>\n\n\t\t\t<style type='text\/css'>\n\t\t\t\t#sc_gallery-1 {\n\t\t\t\t\tmargin: auto;\n\t\t\t\t}\n\t\t\t\t#sc_gallery-1 .gallery-item {\n\t\t\t\t\tfloat: left;\n\t\t\t\t\ttext-align: center;\n\t\t\t\t\twidth: 49.99%;\n\t\t\t\t}\n\t\t\t\t#sc_gallery-1 img {\n\t\t\t\t\tborder: 2px solid #cfcfcf;\n\t\t\t\t}\n\t\t\t\t\/* see sc_gallery() in functions\/theme-shortcodes.php *\/\n\t\t\t<\/style>\n\t\t<div id='sc_gallery-1' class='gallery galleryid-53678 gallery-columns-2 gallery-size-large file element_classes gallery-default'><dl class='gallery-item'  data-title='PV ProTec C(R) 40-1000 Y TD (500x500)' data-description=''><div class='gallery-item-wrapper'>\n\t\t\t\t<dt class='gallery-icon landscape'>\n\t\t\t\t\t<a href='https:\/\/yilkomer.com\/wp-content\/uploads\/2016\/03\/PV-ProTec-CR-40-1000-Y-TD-500x500-1.jpg'><img loading=\"lazy\" decoding=\"async\" width=\"500\" height=\"500\" src=\"https:\/\/yilkomer.com\/wp-content\/uploads\/2016\/03\/PV-ProTec-CR-40-1000-Y-TD-500x500-1.jpg\" class=\"attachment-large size-large\" alt=\"raycap PV ProTec C(R) 40-1000 Y TD (500x500)\" srcset=\"https:\/\/yilkomer.com\/wp-content\/uploads\/2016\/03\/PV-ProTec-CR-40-1000-Y-TD-500x500-1.jpg 500w, https:\/\/yilkomer.com\/wp-content\/uploads\/2016\/03\/PV-ProTec-CR-40-1000-Y-TD-500x500-1-300x300.jpg 300w, https:\/\/yilkomer.com\/wp-content\/uploads\/2016\/03\/PV-ProTec-CR-40-1000-Y-TD-500x500-1-150x150.jpg 150w, https:\/\/yilkomer.com\/wp-content\/uploads\/2016\/03\/PV-ProTec-CR-40-1000-Y-TD-500x500-1-146x146.jpg 146w, https:\/\/yilkomer.com\/wp-content\/uploads\/2016\/03\/PV-ProTec-CR-40-1000-Y-TD-500x500-1-50x50.jpg 50w, https:\/\/yilkomer.com\/wp-content\/uploads\/2016\/03\/PV-ProTec-CR-40-1000-Y-TD-500x500-1-75x75.jpg 75w, https:\/\/yilkomer.com\/wp-content\/uploads\/2016\/03\/PV-ProTec-CR-40-1000-Y-TD-500x500-1-85x85.jpg 85w, https:\/\/yilkomer.com\/wp-content\/uploads\/2016\/03\/PV-ProTec-CR-40-1000-Y-TD-500x500-1-80x80.jpg 80w\" sizes=\"auto, (max-width:767px) 480px, 500px\" \/><\/a>\n\t\t\t\t<\/dt><\/div><\/dl><dl class='gallery-item'  data-title='PV ProTec B(R) 5-1000 Y TD' data-description=''><div class='gallery-item-wrapper'>\n\t\t\t\t<dt class='gallery-icon portrait'>\n\t\t\t\t\t<a href='https:\/\/yilkomer.com\/wp-content\/uploads\/2016\/03\/PV-ProTec-BR-5-1000-Y-TD.jpg'><img loading=\"lazy\" decoding=\"async\" width=\"731\" height=\"1024\" src=\"https:\/\/yilkomer.com\/wp-content\/uploads\/2016\/03\/PV-ProTec-BR-5-1000-Y-TD-731x1024.jpg\" class=\"attachment-large size-large\" alt=\"raycap PV ProTec B(R) 5-1000 Y TD\" srcset=\"https:\/\/yilkomer.com\/wp-content\/uploads\/2016\/03\/PV-ProTec-BR-5-1000-Y-TD-731x1024.jpg 731w, https:\/\/yilkomer.com\/wp-content\/uploads\/2016\/03\/PV-ProTec-BR-5-1000-Y-TD-214x300.jpg 214w, https:\/\/yilkomer.com\/wp-content\/uploads\/2016\/03\/PV-ProTec-BR-5-1000-Y-TD-768x1076.jpg 768w, https:\/\/yilkomer.com\/wp-content\/uploads\/2016\/03\/PV-ProTec-BR-5-1000-Y-TD-1097x1536.jpg 1097w, https:\/\/yilkomer.com\/wp-content\/uploads\/2016\/03\/PV-ProTec-BR-5-1000-Y-TD-104x146.jpg 104w, https:\/\/yilkomer.com\/wp-content\/uploads\/2016\/03\/PV-ProTec-BR-5-1000-Y-TD-36x50.jpg 36w, https:\/\/yilkomer.com\/wp-content\/uploads\/2016\/03\/PV-ProTec-BR-5-1000-Y-TD-54x75.jpg 54w, https:\/\/yilkomer.com\/wp-content\/uploads\/2016\/03\/PV-ProTec-BR-5-1000-Y-TD-514x720.jpg 514w, https:\/\/yilkomer.com\/wp-content\/uploads\/2016\/03\/PV-ProTec-BR-5-1000-Y-TD-600x840.jpg 600w, https:\/\/yilkomer.com\/wp-content\/uploads\/2016\/03\/PV-ProTec-BR-5-1000-Y-TD.jpg 1235w\" sizes=\"auto, (max-width:767px) 480px, 731px\" \/><\/a>\n\t\t\t\t<\/dt><\/div><\/dl><br style=\"clear: both\" \/>\n\t\t\t<\/div>\n\n","protected":false},"excerpt":{"rendered":"<p>1- GENERAL: Was the facility installed in accordance with its project? Was the underground cable installation carried out in accordance with the Cable Installation Procedures and<span class=\"excerpt-hellip\"> [\u2026]<\/span><\/p>\n","protected":false},"author":1,"featured_media":47886,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_joinchat":[],"footnotes":""},"categories":[193],"tags":[],"class_list":["post-53678","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-general"],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v19.2.1 (Yoast SEO v27.4) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Key Points to Consider During the Acceptance of Solar Power Plants<\/title>\n<meta name=\"description\" content=\"You can read about the key points to consider during the acceptance of Solar Power Plants in our article.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/yilkomer.com\/en\/key-points-to-consider-during-the-acceptance-of-solar-power-plants\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Key Points to Consider During the Acceptance of Solar Power Plants\" \/>\n<meta property=\"og:description\" content=\"1- GENERAL: Was the facility installed in accordance with its project? Was the underground cable installation carried out in accordance with the Cable\" \/>\n<meta property=\"og:url\" content=\"https:\/\/yilkomer.com\/en\/key-points-to-consider-during-the-acceptance-of-solar-power-plants\/\" \/>\n<meta property=\"og:site_name\" content=\"Y\u0131lkomer\" \/>\n<meta property=\"article:author\" content=\"https:\/\/www.facebook.com\/yilkomer\" \/>\n<meta property=\"article:published_time\" content=\"2016-03-22T18:41:44+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2025-12-19T21:15:53+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/yilkomer.com\/wp-content\/uploads\/2015\/09\/ges-topraklama-projesi.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"784\" \/>\n\t<meta property=\"og:image:height\" content=\"515\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Y\u0131ld\u0131r\u0131mdan Korunma Merkezi\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Y\u0131ld\u0131r\u0131mdan Korunma Merkezi\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"8 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/yilkomer.com\\\/en\\\/key-points-to-consider-during-the-acceptance-of-solar-power-plants\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/yilkomer.com\\\/en\\\/key-points-to-consider-during-the-acceptance-of-solar-power-plants\\\/\"},\"author\":{\"name\":\"Y\u0131ld\u0131r\u0131mdan Korunma Merkezi\",\"@id\":\"https:\\\/\\\/yilkomer.com\\\/en\\\/#\\\/schema\\\/person\\\/1378732ec91a59af36092fedd9f6f871\"},\"headline\":\"Key Points to Consider During the Acceptance of Solar Power Plants\",\"datePublished\":\"2016-03-22T18:41:44+00:00\",\"dateModified\":\"2025-12-19T21:15:53+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/yilkomer.com\\\/en\\\/key-points-to-consider-during-the-acceptance-of-solar-power-plants\\\/\"},\"wordCount\":1095,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\\\/\\\/yilkomer.com\\\/en\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/yilkomer.com\\\/en\\\/key-points-to-consider-during-the-acceptance-of-solar-power-plants\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/yilkomer.com\\\/wp-content\\\/uploads\\\/2015\\\/09\\\/ges-topraklama-projesi.jpg\",\"articleSection\":[\"General\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/yilkomer.com\\\/en\\\/key-points-to-consider-during-the-acceptance-of-solar-power-plants\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/yilkomer.com\\\/en\\\/key-points-to-consider-during-the-acceptance-of-solar-power-plants\\\/\",\"url\":\"https:\\\/\\\/yilkomer.com\\\/en\\\/key-points-to-consider-during-the-acceptance-of-solar-power-plants\\\/\",\"name\":\"Key Points to Consider During the Acceptance of Solar Power Plants\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/yilkomer.com\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/yilkomer.com\\\/en\\\/key-points-to-consider-during-the-acceptance-of-solar-power-plants\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/yilkomer.com\\\/en\\\/key-points-to-consider-during-the-acceptance-of-solar-power-plants\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/yilkomer.com\\\/wp-content\\\/uploads\\\/2015\\\/09\\\/ges-topraklama-projesi.jpg\",\"datePublished\":\"2016-03-22T18:41:44+00:00\",\"dateModified\":\"2025-12-19T21:15:53+00:00\",\"description\":\"You can read about the key points to consider during the acceptance of Solar Power Plants in our article.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/yilkomer.com\\\/en\\\/key-points-to-consider-during-the-acceptance-of-solar-power-plants\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/yilkomer.com\\\/en\\\/key-points-to-consider-during-the-acceptance-of-solar-power-plants\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/yilkomer.com\\\/en\\\/key-points-to-consider-during-the-acceptance-of-solar-power-plants\\\/#primaryimage\",\"url\":\"https:\\\/\\\/yilkomer.com\\\/wp-content\\\/uploads\\\/2015\\\/09\\\/ges-topraklama-projesi.jpg\",\"contentUrl\":\"https:\\\/\\\/yilkomer.com\\\/wp-content\\\/uploads\\\/2015\\\/09\\\/ges-topraklama-projesi.jpg\",\"width\":784,\"height\":515,\"caption\":\"Ges Topraklama projesi i\u00e7in \u00fccretsiz teknik ke\u015ffimizden yararlanabilirsiniz.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/yilkomer.com\\\/en\\\/key-points-to-consider-during-the-acceptance-of-solar-power-plants\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Ana Sayfa\",\"item\":\"https:\\\/\\\/yilkomer.com\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Key Points to Consider During the Acceptance of Solar Power Plants\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/yilkomer.com\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/yilkomer.com\\\/en\\\/\",\"name\":\"Y\u0131lkomer\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/yilkomer.com\\\/en\\\/#organization\"},\"alternateName\":\"Y\u0131lkomer\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/yilkomer.com\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/yilkomer.com\\\/en\\\/#organization\",\"name\":\"Yilkomer\",\"url\":\"https:\\\/\\\/yilkomer.com\\\/en\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/yilkomer.com\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/yilkomer.com\\\/wp-content\\\/uploads\\\/2015\\\/01\\\/logo.png\",\"contentUrl\":\"https:\\\/\\\/yilkomer.com\\\/wp-content\\\/uploads\\\/2015\\\/01\\\/logo.png\",\"width\":1000,\"height\":189,\"caption\":\"Yilkomer\"},\"image\":{\"@id\":\"https:\\\/\\\/yilkomer.com\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/yilkomer.com\\\/en\\\/#\\\/schema\\\/person\\\/1378732ec91a59af36092fedd9f6f871\",\"name\":\"Y\u0131ld\u0131r\u0131mdan Korunma Merkezi\",\"description\":\"Y\u0131lkomer (Y\u0131ld\u0131r\u0131mdan Korunma Merkezi) \u00fclkemizde y\u0131ld\u0131r\u0131mdan ve a\u015f\u0131r\u0131 gerilimden korunmada teknik eksiklikleri ortadan kald\u0131rarak tamamen standartlar ve m\u00fchendislik hesaplar\u0131na dayanarak sistem kurmay\u0131 hedeflemektedir.\",\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/yilkomer\",\"https:\\\/\\\/www.linkedin.com\\\/profile\\\/view?id=393173773&trk=nav_responsive_tab_profile\",\"https:\\\/\\\/x.com\\\/https:\\\/\\\/twitter.com\\\/yilkomer\",\"admin\"]}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Key Points to Consider During the Acceptance of Solar Power Plants","description":"You can read about the key points to consider during the acceptance of Solar Power Plants in our article.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/yilkomer.com\/en\/key-points-to-consider-during-the-acceptance-of-solar-power-plants\/","og_locale":"en_US","og_type":"article","og_title":"Key Points to Consider During the Acceptance of Solar Power Plants","og_description":"1- GENERAL: Was the facility installed in accordance with its project? Was the underground cable installation carried out in accordance with the Cable","og_url":"https:\/\/yilkomer.com\/en\/key-points-to-consider-during-the-acceptance-of-solar-power-plants\/","og_site_name":"Y\u0131lkomer","article_author":"https:\/\/www.facebook.com\/yilkomer","article_published_time":"2016-03-22T18:41:44+00:00","article_modified_time":"2025-12-19T21:15:53+00:00","og_image":[{"width":784,"height":515,"url":"https:\/\/yilkomer.com\/wp-content\/uploads\/2015\/09\/ges-topraklama-projesi.jpg","type":"image\/jpeg"}],"author":"Y\u0131ld\u0131r\u0131mdan Korunma Merkezi","twitter_misc":{"Written by":"Y\u0131ld\u0131r\u0131mdan Korunma Merkezi","Est. reading time":"8 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/yilkomer.com\/en\/key-points-to-consider-during-the-acceptance-of-solar-power-plants\/#article","isPartOf":{"@id":"https:\/\/yilkomer.com\/en\/key-points-to-consider-during-the-acceptance-of-solar-power-plants\/"},"author":{"name":"Y\u0131ld\u0131r\u0131mdan Korunma Merkezi","@id":"https:\/\/yilkomer.com\/en\/#\/schema\/person\/1378732ec91a59af36092fedd9f6f871"},"headline":"Key Points to Consider During the Acceptance of Solar Power Plants","datePublished":"2016-03-22T18:41:44+00:00","dateModified":"2025-12-19T21:15:53+00:00","mainEntityOfPage":{"@id":"https:\/\/yilkomer.com\/en\/key-points-to-consider-during-the-acceptance-of-solar-power-plants\/"},"wordCount":1095,"commentCount":0,"publisher":{"@id":"https:\/\/yilkomer.com\/en\/#organization"},"image":{"@id":"https:\/\/yilkomer.com\/en\/key-points-to-consider-during-the-acceptance-of-solar-power-plants\/#primaryimage"},"thumbnailUrl":"https:\/\/yilkomer.com\/wp-content\/uploads\/2015\/09\/ges-topraklama-projesi.jpg","articleSection":["General"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/yilkomer.com\/en\/key-points-to-consider-during-the-acceptance-of-solar-power-plants\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/yilkomer.com\/en\/key-points-to-consider-during-the-acceptance-of-solar-power-plants\/","url":"https:\/\/yilkomer.com\/en\/key-points-to-consider-during-the-acceptance-of-solar-power-plants\/","name":"Key Points to Consider During the Acceptance of Solar Power Plants","isPartOf":{"@id":"https:\/\/yilkomer.com\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/yilkomer.com\/en\/key-points-to-consider-during-the-acceptance-of-solar-power-plants\/#primaryimage"},"image":{"@id":"https:\/\/yilkomer.com\/en\/key-points-to-consider-during-the-acceptance-of-solar-power-plants\/#primaryimage"},"thumbnailUrl":"https:\/\/yilkomer.com\/wp-content\/uploads\/2015\/09\/ges-topraklama-projesi.jpg","datePublished":"2016-03-22T18:41:44+00:00","dateModified":"2025-12-19T21:15:53+00:00","description":"You can read about the key points to consider during the acceptance of Solar Power Plants in our article.","breadcrumb":{"@id":"https:\/\/yilkomer.com\/en\/key-points-to-consider-during-the-acceptance-of-solar-power-plants\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/yilkomer.com\/en\/key-points-to-consider-during-the-acceptance-of-solar-power-plants\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/yilkomer.com\/en\/key-points-to-consider-during-the-acceptance-of-solar-power-plants\/#primaryimage","url":"https:\/\/yilkomer.com\/wp-content\/uploads\/2015\/09\/ges-topraklama-projesi.jpg","contentUrl":"https:\/\/yilkomer.com\/wp-content\/uploads\/2015\/09\/ges-topraklama-projesi.jpg","width":784,"height":515,"caption":"Ges Topraklama projesi i\u00e7in \u00fccretsiz teknik ke\u015ffimizden yararlanabilirsiniz."},{"@type":"BreadcrumbList","@id":"https:\/\/yilkomer.com\/en\/key-points-to-consider-during-the-acceptance-of-solar-power-plants\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Ana Sayfa","item":"https:\/\/yilkomer.com\/en\/"},{"@type":"ListItem","position":2,"name":"Key Points to Consider During the Acceptance of Solar Power Plants"}]},{"@type":"WebSite","@id":"https:\/\/yilkomer.com\/en\/#website","url":"https:\/\/yilkomer.com\/en\/","name":"Y\u0131lkomer","description":"","publisher":{"@id":"https:\/\/yilkomer.com\/en\/#organization"},"alternateName":"Y\u0131lkomer","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/yilkomer.com\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/yilkomer.com\/en\/#organization","name":"Yilkomer","url":"https:\/\/yilkomer.com\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/yilkomer.com\/en\/#\/schema\/logo\/image\/","url":"https:\/\/yilkomer.com\/wp-content\/uploads\/2015\/01\/logo.png","contentUrl":"https:\/\/yilkomer.com\/wp-content\/uploads\/2015\/01\/logo.png","width":1000,"height":189,"caption":"Yilkomer"},"image":{"@id":"https:\/\/yilkomer.com\/en\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/yilkomer.com\/en\/#\/schema\/person\/1378732ec91a59af36092fedd9f6f871","name":"Y\u0131ld\u0131r\u0131mdan Korunma Merkezi","description":"Y\u0131lkomer (Y\u0131ld\u0131r\u0131mdan Korunma Merkezi) \u00fclkemizde y\u0131ld\u0131r\u0131mdan ve a\u015f\u0131r\u0131 gerilimden korunmada teknik eksiklikleri ortadan kald\u0131rarak tamamen standartlar ve m\u00fchendislik hesaplar\u0131na dayanarak sistem kurmay\u0131 hedeflemektedir.","sameAs":["https:\/\/www.facebook.com\/yilkomer","https:\/\/www.linkedin.com\/profile\/view?id=393173773&trk=nav_responsive_tab_profile","https:\/\/x.com\/https:\/\/twitter.com\/yilkomer","admin"]}]}},"_links":{"self":[{"href":"https:\/\/yilkomer.com\/en\/wp-json\/wp\/v2\/posts\/53678","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/yilkomer.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/yilkomer.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/yilkomer.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/yilkomer.com\/en\/wp-json\/wp\/v2\/comments?post=53678"}],"version-history":[{"count":2,"href":"https:\/\/yilkomer.com\/en\/wp-json\/wp\/v2\/posts\/53678\/revisions"}],"predecessor-version":[{"id":53685,"href":"https:\/\/yilkomer.com\/en\/wp-json\/wp\/v2\/posts\/53678\/revisions\/53685"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/yilkomer.com\/en\/wp-json\/wp\/v2\/media\/47886"}],"wp:attachment":[{"href":"https:\/\/yilkomer.com\/en\/wp-json\/wp\/v2\/media?parent=53678"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/yilkomer.com\/en\/wp-json\/wp\/v2\/categories?post=53678"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/yilkomer.com\/en\/wp-json\/wp\/v2\/tags?post=53678"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}