{"id":992725,"date":"2025-11-11T11:40:06","date_gmt":"2025-11-11T08:40:06","guid":{"rendered":"https:\/\/testdijitalist.com\/solutions\/measurement-and-electrical-installation-inspection\/"},"modified":"2026-08-20T09:54:38","modified_gmt":"2026-08-20T06:54:38","slug":"measurement-and-electrical-installation-inspection","status":"publish","type":"page","link":"https:\/\/yilkomer.com\/en\/solutions\/measurement-and-electrical-installation-inspection\/","title":{"rendered":"Measurement and Electrical Installation Inspection"},"content":{"rendered":"\t\t<div data-elementor-type=\"wp-page\" data-elementor-id=\"992725\" class=\"elementor elementor-992725 elementor-3171\" data-elementor-post-type=\"page\">\n\t\t\t\t<div class=\"elementor-element elementor-element-3f1969d5 e-flex e-con-boxed e-con e-parent\" data-id=\"3f1969d5\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t\t\t<div class=\"vamtam-has-theme-widget-styles elementor-element elementor-element-1f2873c5 elementor-widget elementor-widget-text-editor\" data-id=\"1f2873c5\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<section><p><strong>Lightning protection and earthing require continuous verification.<\/strong> A system that worked correctly on the day it was installed can lose its function over the years \u2014 through corrosion, a loosened connection or a conductor cut during renovation work. This loss is not visible to the eye; it shows up only in measurement. <\/p><p>At this point the electrical issues have to be approached from a broad perspective: the problems need to be laid out through measurement and reporting, and solutions sought from there. As Y\u0131lkomer, we carry out the measurement and analysis of your facility with state-of-the-art, currently calibrated measuring systems and our expert team. The reporting that follows prevents potential failures \u2014 above all those caused by lightning and transient overvoltage surges.  <\/p><p><strong>The calibration of our measuring instruments is carried out in laboratories accredited by T\u00dcRKAK, the Turkish Accreditation Agency.<\/strong><\/p><\/section><section><h2>Earthing and Continuity Measurements<\/h2><ul><li><strong>General earthing measurement<\/strong> \u2014 Determination of the resistance value of the facility&#8217;s earthing system.<\/li><li><strong>System earthing measurement<\/strong> \u2014 The network neutral point and components earthed for operational reasons.<\/li><li><strong>Functional earthing measurement <\/strong>\u2014 Verification of the reference earth of electronic systems.<\/li><li><strong>Soil resistivity measurement <\/strong>\u2014 The electrical characteristics of the ground; for new designs and for the evaluation of existing systems.<\/li><li><strong>Electrical continuity tests <\/strong>\u2014 The integrity of the connection between the air termination system, the down conductors and the earthing.<\/li><li><strong>Equipotential bonding inspection <\/strong>\u2014 Inspection of the busbar connections and the bonding of metal services.<\/li><li>Fault current measurement \u2014 The functionality of the residual current protection system.<\/li><\/ul><\/section><section><h2>Lightning Protection System Inspection<\/h2><ul><li><strong>Faraday cage measurement and system inspection <\/strong>\u2014 Compliance of the mesh geometry, the number of down conductors, continuity and connection points with the standard.<\/li><li><strong><a href=\"https:\/\/www.claudeusercontent.com\/paratoner-bakimi-ve-olcumu\/\" target=\"_blank\" rel=\"noopener\">ESE air terminal measurement and system inspection <\/a><\/strong>\u2014 Assessment of the head condition, the down conductor route, the separation distance and the earthing connection.<\/li><\/ul><\/section><section><h2>Electrical Installation Measurement and Inspection<\/h2><ul><li><strong>Loop impedance measurement <\/strong>\u2014 The tripping reliability of the protective device in the event of a fault.<\/li><li><strong>Insulation resistance measurement <\/strong>\u2014 The condition of the cable and installation insulation.<\/li><li><strong>Electrical installation inspection and reporting <\/strong>\u2014 Assessment of the compliance of the entire installation with the regulations.<\/li><li><strong>Thermal imaging inspection <\/strong>\u2014 Detection of overheating connections, unbalanced loads and overloaded circuits before a failure occurs.<\/li><li><strong>Relay testing <\/strong>\u2014 Setting and function tests of the protection relays.<\/li><li><strong>Transformer turns ratio measurement <\/strong>\u2014 Verification of the transformer winding ratios.<\/li><li><strong>Energy analysis and reporting <\/strong>\u2014 Assessment of power quality, harmonics and the load profile.<\/li><\/ul><\/section><section><h2>Ambient and Environmental Measurements<\/h2><ul><li><strong>Electric field measurement<\/strong><\/li><li><strong>Magnetic field measurement<\/strong><\/li><li><strong>Electromagnetic radiation (RF) measurements<\/strong><\/li><li><strong>Noise measurement<\/strong><\/li><li><strong>Humidity and temperature measurement<\/strong><\/li><li><strong>Wind measurement<\/strong><\/li><\/ul><p>These measurements are carried out for occupational health and safety obligations, for areas housing sensitive equipment, and for projects where site conditions have to be documented.<\/p><section><h2>What Do You Receive After the Measurement?<\/h2><ul><li><strong>Measurement report <\/strong>\u2014 With every measurement point, the instrument used, the measurement conditions and the resulting values.<\/li><li><strong>Compliance assessment<\/strong> \u2014 Comparison of the measured values against the limits in the relevant standard and regulation.<\/li><li><strong>Non-conformity list <\/strong>\u2014 The deficiencies identified, with photographs and location information.<\/li><li><strong>Improvement recommendations <\/strong>\u2014 The corrective action proposed for each non-conformity, together with its priority.<\/li><li><strong>Calibration certificates <\/strong>\u2014 The calibration certificates of the instruments used, appended to the report.<\/li><li><strong>Inspection schedule<\/strong> \u2014 The date of the next measurement.<\/li><\/ul><\/section><section><h2>When Should You Have Measurements Carried Out?<\/h2><ul><li><strong>When the inspection period falls due<\/strong> \u2014 Regularly, at the interval prescribed by the regulations.<\/li><li><strong>When a new system is commissioned <\/strong>\u2014 A verification measurement before handover.<\/li><li><strong>After renovation or excavation work <\/strong>\u2014 Underground conductors are damaged most often during this kind of work.<\/li><li><strong>After a lightning strike <\/strong>\u2014 For the cases where the system did its job but was degraded in the process.<\/li><li><strong>When equipment failures cannot be explained <\/strong>\u2014 The source of recurring board and power supply failures is often on the earthing side.<\/li><li><strong>Before an inspection <\/strong>\u2014 Spotting the deficiencies before the inspector does is always cheaper.<\/li><\/ul><\/section><\/section>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-10f50b elementor-widget-divider--view-line elementor-widget elementor-widget-divider\" data-id=\"10f50b\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"divider.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t<div class=\"elementor-divider\">\n\t\t\t<span class=\"elementor-divider-separator\">\n\t\t\t\t\t\t<\/span>\n\t\t<\/div>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t","protected":false},"excerpt":{"rendered":"<p>Lightning protection and earthing require continuous verification. A system that worked correctly on the day it was installed can lose its function over the years \u2014 through corrosion, a loosened connection or a conductor cut during renovation work. This loss is not visible to the eye; it shows up only in measurement. At this point&#8230;<\/p>\n","protected":false},"author":1,"featured_media":992724,"parent":992417,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"footnotes":""},"class_list":["post-992725","page","type-page","status-publish","has-post-thumbnail","hentry"],"_links":{"self":[{"href":"https:\/\/yilkomer.com\/en\/wp-json\/wp\/v2\/pages\/992725","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/yilkomer.com\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/yilkomer.com\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/yilkomer.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/yilkomer.com\/en\/wp-json\/wp\/v2\/comments?post=992725"}],"version-history":[{"count":1,"href":"https:\/\/yilkomer.com\/en\/wp-json\/wp\/v2\/pages\/992725\/revisions"}],"predecessor-version":[{"id":992726,"href":"https:\/\/yilkomer.com\/en\/wp-json\/wp\/v2\/pages\/992725\/revisions\/992726"}],"up":[{"embeddable":true,"href":"https:\/\/yilkomer.com\/en\/wp-json\/wp\/v2\/pages\/992417"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/yilkomer.com\/en\/wp-json\/wp\/v2\/media\/992724"}],"wp:attachment":[{"href":"https:\/\/yilkomer.com\/en\/wp-json\/wp\/v2\/media?parent=992725"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}